Project name
Structural Steel Refurbishment
Location
POWER STATION
Country
NORTHERN IRELAND
Market area
GENERAL MAINTENANCE

 

Requirement
Recoating of structural steel giving long term protection
Surface Preparation
Surfaces degreased and pressure jetted to prior to hand preparation to St3 standard of EN ISO 8501-1: 2007.Preparation was completed by a fresh water wash to remove any dust created
Coatings
One coat of Corroless EPF Primer and one coat of Corroless RF65 were applied with stripe coating where appropriate.
Product (per coat) DFT (per coat) Colour
Corroless EPF 200 microns Buff
Corroless RF65 50 microns Blue

Comments
System has an expected life of 15 to 25 years before major maintenance